ADDITIONAL DOCUMENTS TO BE SUBMITTED WHEN APPLYING FOR A BUILDING PERMIT


Residential Utility Service Information (Load Sheets)

Utility demand load sheet forms are available at the Inspection Services Division and must be submitted with the building permit application and plans when required. This information is used by the City's Utilities Engineering Division to determine the adequacy of existing services lines and meters.

The entire form must be completed for water, gas and electrical demand when applying for a permit for a new home.

Additions which involve a relocation of electric or gas service, a change in the main electric panel size, or any change in natural gas demand will require the appropriate sections of the form completed.

Load sheets are also required for swimming pools, hot tubs and spa permits.

Engineering Documents

Soils reports where required, and structural calculations as discussed under "Engineered Plans", will be required at the time of permit application.

Variances

If a zoning variance is required to construct any portion of the work included in the permit application, a copy of the approved variance should accompany the application.


PreviousPage TableOfContents NextPage